With the passing of time, various improvements were made in order to continue growing as well as contribute to nation-building by providing construction services throughout the country.
The first significant growth occurred in 1972, when the name Perusahaan Negara Widjaja Karja was changed to PT Wijaya Karya. WIKA then developed into a construction contractor by handling various important projects such as the installation of electricity grids at Asahan and the Jatiluhur irrigation project.
In the mid of 2009, WIKA together with other companies have succeded in completing the Suramadu Bridge, a prestigious project that connects Java and Madura islands. Currently the project have been enjoyed by the community at large.
Entering 2010, WIKA is faced with a changing business environment with greater challenges. Thus, WIKA has defined a new vision which is the Vision 2020, to become one of the best integrated EPC and Investment Companies in South East Asia. The vision is believed to provide direction to every WIKA's line of business to achieve optimum growth, healthy and sustainable.
Lead Electrical Engineer
- Male
- S1 Electrical (reputable university)
- Having 3-5 years work experiences in Power Plant Project
- Experience in Power Plant is preference
- Familiar with Panel, Cable, Tray, Trafo, Ups, etc, Bulk Material
- Familiar with related Code & Standard (IEC, ANSI, IEEE, NEC), Equipment Sizing (MCC, SWGR, TRANSFORMER, EDG, UPS, DC System), System Study, Data Sheet
- Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
- Familiar with electrical engineering software such as ETAP
- Male
- S1 Chemical Engineering (reputable university)
- Min 3-5 years work experiences
- Experience in Power Plant Project is preference
- Familiar with related Code & Std, Process Description, PFD, PID, Material & Heat Balace, Thermodinamic, Process Control Philosophy, Operating Phylosophi. Preferable understood Precomm & Comm
- Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant.
- Male
- S1 Electrical / Instrument / Engineering Physics (reputable university)
- Min 3-5 years work experiences
- Experience in Power Plant Project is preference
- Familiar with related Code and std (ISA, API, ASTM, ASME) PLC, DCS, SCADA, Field Instrument, Loop Diagram, Hook Up
- Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
- Male
- S1 Electrical (reputable university)
- Min 6 years work experiences
- Experience in Power Plant is preference
- Familiar with electrical engineering code & standard for Power Plant application
- Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
- Familiar with electrical engineering software such as ETAP
- Male
- S1 Engineering Physics (reputable university)
- Min 6 years work experiences
- Experience in Power Plant Project is preference
- Familiar with Instrument & Control engineering code & standard for Power Plant application
- Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
- Male
- S1 Mechanical (reputable university)
- Minimum 5 years experience as Mechanical Engineer of Designing, Maintenance or Construction in power plant project
- Advance knowledge in pump and pumping and skill in Hydraulic calculation & thermodynamic
- Applied knowledge of mechanic of material and machine elements & Project Management
- Basic knowledge of safety environment (LOTO, permit system, lifting, rigging, scaffolding, fire protection, hydrocarbon management, etc)
- Basic knowledge of material & welding inspection
- Understand well with API, ANSI, ASTM, ASME
- Understand well with other design and construction of process facilities modification, upgrade, or new design
- Understand well with pipe stress analysis, Caesar & Fluid flow and modeling software
- Male
- S1 Electrical / Mechanical (reputable university)
- Min 4 years work experiences
- Experience in Power Plant Project is preference
- Has experience in installation, inspection & test, pre-commissioning, and commissioning for power plant.
- Familiar with code and standard for site inspection and test electrical equipments for power plant application.
- Familiar with site inspection & test, pre-com/commissioning report procedure
- Ready for remote area
- Working under pressure
- Fluently in English
- Microsoft Office / Open Office (Microsoft word, Microsoft excel, Microsoft Project, Microsoft Power Point)
Email - Lowongan PT Wijaya Karya (Persero) Agustus 2011
Only short-listed candidates will be contacted for further interview
1 komentar:
This site is really good and informative.Thank you very much for this.
cable trays
Post a Comment